WA Construction Gallery
-
Ramsden Reservoir Holmfirth
Ramsden Reservoir A £2.6m project to improve Ramsden Dam near the village of Holme. New spillway construction with an intricate in situ bridge cast over the spillway. Lessons learnt over the years and the apparent increase in the frequency of extreme weather events have prompted new designs...
-
Bredbury Parkway
Bredbury Parkway Enabling works. Concrete retaining wall to enable construction of a new recycling centre in Stockport.
-
A55 Talardy
Talardy Parapet replacement scheme North Wales.
-
Sport England Nottingham
Slalom course upgrade used for canoeing and white water rafting in Nottingham. Training is carried out here for the Olympics.
-
Bulk Storage Facility Warrington
Bulk Storage unit constructed. Reinforced base and walls with external yard slabs. Power floated bases. Walls 5 metres high. External yards slabs with brush finish.
-
Featherstone Prison
Incoming power building. One sided formwork used to face off the piles with reinforced concrete.
-
Embsay Reservoir
Embsay reservoir New reinforced concrete base and walls constructed to form a Spillway channel. Walls were given a textured finish this was achieved using Zemdrain which was fixed to the formwork. A stilling basin was also constructed. One sided wall formwork was used to face off concrete piles.
-
Coldwell Reservoir
New reinforced concrete Spillway channel. Also includes a Wier, Tumblebay and Bridge Deck.
-
Kronospan Wrexham
A new lagoon was constructed. Various inlet outlet chambers along with retaining walls and upstands.
-
YORK
Large Wier Structures and associated Head Walls around the perimeter of York University.
-
Kirklees Brook Crossing
Kirklees Brook Crossing